Skip to content

Getting started

Start with a file.
Build from there.

A PDF or CAD file is all you need to start with Storegen. Add product and operational context as your digital twin project takes shape.

Explore Storegen

Autonomous full 3D layout design and redesign. BIM-ready infrastructure for your digital twin.

01 / Start the spatial model

Bring your PDF or CAD file and the space you want to design or rethink.

02 / Add the context for your decision

Use the guide below to prepare data, agree scope, and validate your wider digital twin project.

See example data files ↓

The project brief

One store. One clear question.

You can start the layout with a PDF or CAD file. The steps below help scope the additional context needed for the decision you want your digital twin to support.

  1. 01

    Choose the decision

    Describe the store change you want to evaluate: a promotional display, a planogram, shopper access, or a checkout arrangement. Name the store or merchandising owner who will review the result.

  2. 02

    Start the spatial foundation

    Start Storegen with a PDF or CAD file. For the wider twin project, add fixture and checkout details, reference photos, and location identifiers as the scope requires.

  3. 03

    Prepare a representative data sample

    Gather the product master, relevant POS and stock exports, and existing planograms or brand rules. Note the date range, units, time zone, source system, and gaps. Include observations if the question involves shopper movement.

  4. 04

    Agree the project scope

    Agree the wider project with the dg2n team: data mapping, baseline, scenarios, success measures, and deliverables. Keep this scope separate from the file needed to start Storegen.

Prepare for your facility type.

The material below supports a wider digital twin project. It is not a prerequisite for starting Storegen with a PDF or CAD file. Agree which inputs your decision actually needs.

Customer-facing retail stores

Store layouts, merchandising, shopper movement, and checkout arrangements.

Project inputs
Current store floor plan; fixture and checkout positions and dimensions; reference photos; product master with categories and dimensions.
Useful additional context
Existing planograms, brand and merchandising rules, product-to-fixture mappings, stock reports, and dated POS exports. For movement or checkout questions, include relevant observations, queue timings, and trading patterns where available.

Warehouses

Picking routes, stock placement, and storage utilisation.

Project inputs
Floor plan with rack and bin locations; facility photos; item master; stock snapshot; timestamped pick and put reports.
Useful additional context
Rack capacities, SKU dimensions, three months of activity, and picking or replenishment SOPs.

Dark stores & fulfilment centres

Order movement, replenishment, and picking arrangements.

Project inputs
Floor plan with pick, pack, and storage zones; photos; item master; stock, pick, and replenishment exports.
Useful additional context
Order timestamps, batching rules, shift patterns, and demand history covering typical and peak periods.

See what useful input looks like.

These small CSV files contain fictional warehouse data. They illustrate how records connect; they are preparation examples, not a production upload schema. Confirm the mapping for your source system with the dg2n team.

For a retail store, use your product master alongside existing planograms or a product-to-fixture list and a relevant POS export. Include brand rules as a separate reference. Record the date and level of detail: store-level sales cannot establish fixture-level performance or shopper paths on their own.

How the example records connect

Match sku across all three files. Match facility_id and location_id between stock and pick records, then map those location IDs to the floor plan. Example timestamps use UTC; quantities use the item master's unit of measure.

Start with exports. Define the connection.

A representative export gives the team a concrete starting point. For ongoing data sharing, discuss file transfer or an API connection to your POS or inventory system during scoping. For warehouse and fulfilment projects, include the relevant WMS or OMS sources. Confirm the available connection method for your system before planning an ongoing integration.

Mapping
Identify stable product, store, department, and fixture keys where available. Document field names, units, and missing values; keep mappings explicit when POS data has no fixture identifier.
Refresh cadence
Agree whether the project needs a snapshot, periodic files, or a direct integration. Record when each dataset was last updated.
Access & ownership
Nominate a source-system owner and agree the access method and required fields with your technical team.
Quality checks
Check duplicate IDs, missing locations, timestamps, and totals. Resolve mismatches before using the data as a baseline.

Review the model before acting.

The model is only useful when the baseline and assumptions represent your operation. Use this checklist with the facility owner.

  • Confirm floor plan dimensions, fixture locations, and report-to-location mapping.
  • Reconcile sample inventory and activity totals against the source reports.
  • Document trading or demand patterns, staffing, movement and service assumptions, brand constraints, and excluded conditions.
  • Compare the baseline with observed operations and explain material differences. Treat simulated shopper behavior as an assumption to validate, not measured customer preference.
  • Keep assumptions consistent when comparing alternatives; record each intended change.
  • Have the operations owner review the proposed pilot, then measure its real-world outcome.

Agree what the project should deliver.

Use these as a scoping checklist. The final handoff should reflect your selected modules and the agreed project scope.

Facility baseline

A reviewed facility model and documented location mapping.

Data & assumptions

A record of source datasets, coverage, refresh cadence, and modelling assumptions.

Scenario review

A comparison of the agreed alternatives and the tradeoffs relevant to your question.

Pilot plan

An operational owner, a selected change, and a measurement plan for validating the result.